A multi-stage development consisting of 6 towers, each up to 10 residential storeys, a podium level of commercial spaces and 4 levels of basement carparking.

Auburn Square development presented many challenges such as the notorious Ashfield shale geological formation in the area and the associated risk of a rock wedge daylighting to the excavation. Our close collaboration with the geotechnical engineers in the design and documentation of the shoring system was a key factor in the successful delivery of this project. We engineered a solution to stabilise the rock wedge using a combination of the shotcrete soldier piled shoring wall system for the upper two basement and hybrid shotcrete anchor system for the lower two basements.